Villa Marie Company Daycare Center, Göppingen (2021), Fluck Holzbau GmbH

Comprehensive planning and project management for a timber-frame kindergarten, including MEP

BIM CAD Reference 001

Project Overview

The new construction of the “Villa Marie” company-run kindergarten in Göppingen involved a comprehensive project management approach using timber construction. The project covered a floor area of approximately 1,400 m² and placed high demands on the integration of architecture, structural engineering, and building services.
The goal was to create a functional, sustainable, and reliable building while taking into account the specific requirements of a modern company-run daycare center.

Project Highlights

  • Client: Christophsbad GmbH & Co. Fachkrankenhaus KG / BruderhausDiakonie
  • Role: General contractor, project management, and planning
  • Contact: Florian Fluck
  • Year of construction: 2021
  • Size: approx. 1,400 m²
  • Construction method: Wood construction
BIM CAD Reference 002
BIM CAD Reference 003
BIM CAD Reference 004

Project Timeline

The project was implemented using an integrated planning approach, in which all disciplines – particularly the MEP (mechanical, electrical, and plumbing) systems – were coordinated at an early stage and integrated into the timber structure.

A key focus was on coordinating technical spaces, routing of cables and fire protection requirements, particularly in conjunction with the timber construction method. In parallel, the permit planning as well as the execution and installation planning were developed and continuously coordinated.

During the construction phase, all subcontractors, including the building MEP disciplines, were managed and coordinated. Quality, schedules, and costs were continuously monitored. Construction supervision was carried out through Phase 8, including final inspection and handover.

Ensuring smooth future operations was of particular importance, especially with regard to user requirements for the kindergarten’s daily operations.

Services at a Glance

  • Comprehensive planning and project management for a new kindergarten building (~1,400 m², timber construction)
  • Coordination of all disciplines, including MEP services (HVAC, electrical, plumbing)
    Collaboration on MEP services planning and technical building equipment
  • Coordination of utility spaces, cable routing, and integration into the timber structure
  • Permit planning, including fire protection
    Preparation of construction and installation plans
  • Management and coordination of subcontractors
  • Construction supervision through Phase 8, as well as final inspection and handover
  • Cost control, contract management, and management of change orders
  • Sicherstellung von Betrieb, Funktionalität und Nutzeranforderungen
BIM CAD Reference 005
BIM CAD Reference 006

Added value / Results

The project demonstrates the ability to holistically manage complex timber construction projects with integrated MEP services, taking both technical and operational requirements into account at an early stage.
Through the close integration of planning, coordination, and construction, a functionally optimized and sustainably operated building was successfully completed.